![]() | ||||
|---|---|---|---|---|
| Northern Aegean Motorway Kuzey Ege Otoyolu | ||||
![]() | ||||
| Route information | ||||
| Part of | ||||
| Length | 55.2 km (34.3 mi) | |||
| Existed | 2019–present | |||
| Major junctions | ||||
| South end | ||||
| North end | Bergama | |||
| Location | ||||
| Country | Turkey | |||
| Regions | Aegean | |||
| Provinces | İzmir | |||
| Highway system | ||||
| ||||
Otoyol 33, O-33 or North Aegean Motorway (Turkish: Kuzey Ege Otoyolu) and abbreviated as the O-33 is a 55.2 km (34.3 mi) long toll motorway in western Turkey.Beginning at an intersection with İzmir Beltway, the O-33 runs north from Çiğli to Bergama and parallels the D550 for most of its route.[1]
History
On 15 February 2017 the tender to construct the motorway was awarded to a consortium of three companies, IC İçdaş, Kalyon and Astaldi. Like other otoyol projects in Turkey, the tender was awarded under a build-operate-transfer contract until 2027.[2] Groundbreaking for the highway took place on 5 April 2017 in a ceremony attended by Prime Minister Binali Yıldırım and Minister of Transport Ahmet Arslan. The US$408.2 million motorway was opened to traffic on 30 October 2019.[3][4]
The designation O-33 had previously been used for the Bursa Beltway, now designated as a part of the O-5 and O-22.[1]
Exit list
| Province | District | km | mi | Exit | Destinations | Notes |
|---|---|---|---|---|---|---|
| İzmir | Menemen | 0 | 0.0 | Highway continues as O-30 | ||
| 5.4 | 3.4 | K1 | ||||
| 14.3 | 8.9 | Menemen Toll Plaza | ||||
| 16.4 | 10.2 | Buruncuk Tunnel | ||||
| 18.2 | 11.3 | K2 | Connects to | |||
| Aliağa | 23.1 | 14.4 | K3 | Connects to | ||
| 28.8 | 17.9 | K4 | Necmettin Giritlioğlu Cd. — Aliağa | Connects to | ||
| 32.9 | 20.4 | K5 | Aliağa O.S.B. | |||
| 46.3 | 28.8 | K6 | Mimar Sinan Cd. — Yenişakran | |||
| Bergama | 55.2 | 34.3 | K7 | Çandarlı Connector — Port of Çandarlı | Connects to | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||


