| Nunobiki Plateau Wind Farm | |
|---|---|
![]() A view of Mount Bandai from the wind farm | |
| Official name | 郡山布引高原風力発電所 |
| Country | Japan |
| Location | Kōriyama, Fukushima |
| Coordinates | 37°20′04″N 140°02′47.9″E / 37.33444°N 140.046639°E |
| Status | Operational |
| Commission date | February 2007 |
| Owner(s) | J-Power |
| Operator(s) | J-Power |
| Wind farm | |
| Type | Onshore |
| Hub height | 100 m |
| Rotor diameter | 30 m |
| Site elevation |
|
| Power generation | |
| Make and model | Enercon: E-70 |
| Units under const. | 33 units |
| Annual net output | 65,980 KW |
| External links | |
| Website | www |
| Commons | Related media on Commons |
The Nunobiki Highlands Wind Farm (郡山布引高原風力発電所, Kōriyama Nunobiki Fūryoku-hatsudensho) is a wind farm operated by the electric utility company J-Power alongside Lake Inawashiro in Kōriyama, Fukushima, Japan. It is approximately 1,080 meters above sea level.
The wind farm produces 65.98 megawatts of power using a total of 33 type Enercon E-70, wind turbines, and generates enough power for approximately 35,000 houses.[1]
The facility began operating in February 2007. Each wind turbine is about 100 meters high, and each turbine blade is about 30 meters long.