MRT Line 10
Overview
StatusProposed
LocaleQuezon City, Pasig, Makati, Taguig
Termini
Stations18
Technical
Line length22.5 km (14.0 mi)
Track gauge1,435 mm (4 ft 8+12 in)

The C5 Metro Rail Transit Line 10, also known as MRT Line 10 or MRT-10, is a proposed rapid transit line in the Philippines. When completed, the line will be approximately 22.5 kilometers (14.0 mi) long, with 16 stations. The line would run along the Circumferential Road 5 (C5), with a terminus at the Ninoy Aquino International Airport (NAIA), and another terminus in Commonwealth Avenue with a possible interchange with MRT7 at Tandang Sora Station. The line would then run from Commonwealth Avenue through Katipunan Avenue, where there may be a possible interchange with LRT Line 2 at the Aurora Station in Katipunan Avenue. The line would then continue to NAIA along the aforementioned Circumferential Road 5. The planned location of the Line's Train Depot would be on UP Diliman Property in Diliman, Quezon City.[1][2]

The project is expected to cost 92.58 billion, and is currently waiting approval of the relevant approving bodies.[2][3]

Stations

Line 10 would have 18 stations. The known stations are as follows:[4]

Name Structure Type Transfers Location
Commonwealth Elevated 7 Tandang Sora Quezon City
University of the Philippines Elevated
Carlos P. Garcia Elevated
Ateneo Elevated
Aurora Boulevard Elevated Katipunan
P. Tuazon Elevated
Bonny Serrano Elevated
Eastwood Elevated
Green Meadows Elevated
C-5–Ortigas Elevated 4 Tiendesitas Pasig
Julia Vargas Elevated
Bagong Ilog Elevated
Kalayaan Elevated Makati
McKinley Elevated Taguig
Levi Mariano Elevated
Bayani Road Elevated
Nichols Elevated  MMS  Senate–DepEd
NAIA Terminal 3 Elevated  MMS  Metro Manila Subway[5] Pasay

References

  1. "C5 MRT 10 Project | PPP Center". ppp.gov.ph. Retrieved January 1, 2021.
  2. 1 2 Vera, Ben O. de (November 18, 2019). "Tycoons' unsolicited PPP projects bolster 'Build, Build, Build'". INQUIRER.net. Retrieved January 1, 2021.
  3. Ordinario, Cai (October 1, 2018). "Neda reviews proposal for MRT 10, 2 other infrastructure projects | Cai Ordinario". BusinessMirror. Retrieved January 1, 2021.
  4. 49th PBC&E Day 2 (Facebook Live). Philippine Chamber of Commerce and Industry. October 25, 2023. Retrieved October 28, 2023.
  5. "6 subway stations to rise on gov't properties". www.pna.gov.ph. Retrieved January 1, 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.