Line 8
Overview
StatusOperational
LocaleShenzhen, China
Termini
Stations7
Color on map     Orange (#db6d1c)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Wangji Lake stabling yard
Rolling stockTrains service in Line 2
CRRC Zhuzhou (258–281[801–824]) (6A)
History
Opened28 October 2020 (2020-10-28)[1]
Technical
Line length12.367 km (7.7 mi)[2]
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (Overhead lines)
Operating speed80 km/h (50 mph)
SignallingUrbalis 888 CBTC Moving block
Route map

Shekou West Depot
Chiwan
Shekou Port
Sea World
12 to Waterlands Resort East
Shuiwan
Dongjiaotou
Wanxia
Houhai Stabling Yard
Haiyue
Dengliang
Houhai
13 to Shangwu
Keyuan
Hongshuwan
Window of the World
connection to Line 1
Qiaocheng North
Shenkang
connection to Line 7
Antuo Hill
Qiaoxiang
Xiangmi
Xiangmei North
Jingtian
Lianhua West
Futian
3 11 Futian railway station (Guangdong)
Civic Center
Gangxia North
Huaqiang North
Yannan
Grand Theater
1 to Luohu
Hubei
Huangbeiling
Xinxiu
Liantang Checkpoint
Xianhu Road
Liantang
Up arrow 2/8 Down arrow
Wutong Mountain South
Shatoujiao
Haishan
Yantian Port West
Wangji Lake Stabling Yard
Shenwai Senior Campus
Yantian Road
Down arrow Line 8 Phase II
(Under Construction)
Honganwei
Yantianxu
Dameisha
Xiaomeisha
Down arrowLine 8 Phase III
(Under Construction)
Xichong Depot
Xichong

Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line from Liantang to Yantian Road. It opened on 28 October 2020. Line 8 has a length of 12.367 km (7.7 mi) and a total of 7 stations.[2] Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.

Timeline

SegmentCommencementLengthStation(s)Name
Liantang — Yantian Road 28 October 2020 12.367 km (7.68 mi) 7 Phase 1

Service routes

Stations

Service
routes
Station name Connections Nearby bus stops Distance Location
English Chinese
Liantang 莲塘 2 0.0 Luohu
Wutong Mountain South 梧桐山南 1.7
Shatoujiao 沙头角 4.2 Yantian
Haishan 海山 1.5
Yantian Port West 盐田港西 1.2
Shenwai Senior Campus 深外高中 2.9
Yantian Road 盐田路 1.3

    Phase 2 & Phase 3

    • Phase 2 and Phase 3 both under construction. Phase 2 from Yantian Road to Xiaomeisha, opening in 2023.[3] Phase 3 from Xiaomeisha to Xichong, opening in 2025.
    Station name Connections Location
    English Chinese
    Hong'anwei 洪安围 Yantian
    Yantianxu 盐田墟
    Dameisha 大梅沙
    Xiaomeisha 小梅沙
    Xichong 溪涌  32  Dapeng New District

    Rolling Stock

    TypeDate of manufactureSeriesSetsSerial numberAssemblyNotes
    Type A2019–2020Type A stock24258–281[801-824]Tc+Mp+M+M+Mp+TcManufactured by CRRC Zhuzhou Electric Locomotive Works

    Notes

      References

      1. "深圳地铁8号线将于2020年10月28日正式投入运营". 2019-08-13.
      2. 1 2 "深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代". 2019-08-01.
      3. "深圳地铁8号线二期开通日期". citys114. 2023-03-13. Retrieved 2023-04-23.
      This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.