| Line 3 | |
|---|---|
![]() Map of Line 3 | |
| Overview | |
| Status | In operation |
| Owner | Suzhou Rail Transit Co., Ltd |
| Termini | |
| Stations | 37 |
| Service | |
| Type | Rapid transit |
| System | Suzhou Rail Transit |
| Operator(s) | Suzhou Rail Transit Co., Ltd |
| History | |
| Opened | 25 December 2019[1] |
| Technical | |
| Line length | 45.272 km[2] |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]
Stations
| Station name | Connections | Distance km |
Location | |||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Suzhou Xinqu Railway Station | 苏州新区火车站 | 6 |
0.00 | 0.00 | Huqiu | |
| Huichanglu | 惠昌路 | |||||
| Wenchanglu | 文昌路 | |||||
| Changting | 长亭 | |||||
| Tongdun | 铜墩 | |||||
| Mayunlu | 马运路 | |||||
| Xijinqiao | 西津桥 | 8 | ||||
| Heshan | 何山 | |||||
| Shizishan | 狮子山 | 1 |
||||
| Shishanlu | 狮山路 | |||||
| Shajinqiao | 沙金桥 | |||||
| Suoshanqiao West | 索山桥西 | 5 | ||||
| Hengshan | 横山 | |||||
| Hengtang | 横塘 | |||||
| Shihu North | 石湖北 | |||||
| Xinguo | 新郭 | Gusu | ||||
| Panlilu | 盘蠡路 | 2 | Wuzhong | |||
| Baodailu | 宝带路 | 4 | ||||
| Yingchunlu | 迎春路 | |||||
| Beiganglu | 北港路 | SIP | ||||
| Tongyuanlu South | 通园路南 | 7 | ||||
| Shupulu North | 墅浦路北 | |||||
| Dongzhenlu | 东振路 | |||||
| Jinsheqiao | 金厍桥 | 5 | ||||
| Ligongdi West | 李公堤西 | 6 | ||||
| Dongfangzhimen | 东方之门 | 1 | ||||
| Yanyuqiao | 烟雨桥 | |||||
| Nibang | 泥浜 | |||||
| Tangzhuang | 唐庄 | 8 | ||||
| Kuatang | 跨塘 | |||||
| Suzhou Yuanqu Railway Station | 苏州园区火车站 | 8 |
||||
| Fangwanjie | 方湾街 | |||||
| Fenghelu | 丰和路 | |||||
| Shuangmajie | 双马街 | |||||
| Fengtingdadao | 葑亭大道 | 5 | ||||
| Gexiangjie | 戈巷街 | |||||
| Weiting | 唯亭 | 11 | ||||
Through service
Through service between Line 3 and Line 11 will start in late 2023.[4]
Map

Gallery
An image of Exit 6b of Ligongdi West Station, under construction, taken a few weeks before the opening.
An image of Exit 2 of Ligongdi West Station, under construction, taken a few weeks before the opening.
References
- 1 2 "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
- 1 2 "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
- ↑ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07.
此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
- ↑ "地铁S1线拟更名为11号线 预计2023年底与3号线贯通运营".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.