Electronic City
Namma Metro station
This metro station on its final stage completion
General information
Location378, Electronics City Phase 1, Electronic City, Bengaluru, Karnataka 560100
Coordinates12°50′47″N 77°40′16″E / 12.84649°N 77.67112°E / 12.84649; 77.67112
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Central Silk Board / Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Platform numbers (TBC)
Tracks2
Construction
Structure typeElevated
Platform levels2
Other information
StatusUnder Construction
Station codeTBC
History
OpeningApril 2024 (April 2024)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Konappana Agrahara Yellow Line
(Operational around April 2024)
Huskur Road
towards Bommasandra
Location

Electronic City is an upcoming elevated metro station on the Yellow Line of the Namma Metro in southern Bengaluru, India, being built to serve the Information technology hub in Anekal suburb. This will be the first metro station in the Namma Metro network to feature Platform screen doors (PSDs).[1] Alongside the metro station is the Electronic City Elevated Expressway connecting Central Silk Board to Electronic City, including the Infosys campus and Wipro Floating Learning Centre. To the north, the Yellow Line will lead to Konappana Agrahara and to the south to Bommasandra, Attibele and Hosur, an industrial city in Tamil Nadu. The metro station is stated to be operational around April 2024.[2][3][4]

Station layout

Station Layout (TBC)

Electronic City track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side Platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Huskur Road
Platform 1
Northbound
Towards ← Central Silk Board / Rashtreeya Vidyalaya Road next station is Konappana Agrahara
Side Platform | Doors will open on the left Disabled access
L2

Entry/Exit

See also

References

  1. "Metro stn at E-City will be 1st to have platform screen doors". The Times of India. 2023-07-29. ISSN 0971-8257. Retrieved 2023-07-31.
  2. "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 2023-11-11.
  3. "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 2023-10-21. ISSN 0971-8257. Retrieved 2023-11-11.
  4. "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 2023-10-06. Retrieved 2023-11-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.